Portfolio

0+ Solar Projects Managed
10+ Designed, Installed & Managed
0 Facilities Energy & Electrical Audited
10+ Counties Served
Browse Projects

Real work. Real outcomes. Real Kenya.

Our portfolio spans grid-tie, off-grid, hybrid, water pumping, audit, feasibility, and O&M work. Every card includes location, system size, client type, completion date, and a structured challenge/solution/outcome summary.

Grid-Tie Systems

Designed to reduce electricity costs while maintaining grid connectivity for reliability across commercial, retail, and industrial sites.

Off-Grid Systems

Standalone systems delivering reliable power in areas without grid access for schools, conservation, and rural communities.

Hybrid Systems

Integrated solar + battery storage + backup combinations for flexibility and resilience across hotels, homes, and conservation sites.

Specialised Work

Solar water pumping, system design engineering, technical and financial feasibility studies, and EPRA-aligned energy and electrical audits.

Promenade Mall rooftop solar installation in Nyali, Mombasa
Grid-Tie 400 kW Nyali, Mombasa

Promenade Mall Solar PV System

ClientCommercial Retail Complex
ScalePhase 1 of 2
ToolsPVSyst, Helioscope, AutoCAD
Impact 400 kW Phase 1 · One of the largest rooftop systems in coastal Kenya at time of installation.

Challenge: Extremely high daytime electricity demand and rising grid costs threatening operating margins at one of coastal Kenya's major retail malls.

Solution: Designed and managed a 400kW two-phase grid-tie PV system including BoQ/BOM, procurement support, installation supervision and commissioning oversight.

Outcome: Significantly reduced peak-hour utility dependency. One of the largest rooftop commercial systems in coastal Kenya at time of installation.

Performance metrics
  • 400 kW Phase 1 installed capacity
  • Large commercial grid-tie deployment
  • One of the largest rooftop commercial systems in coastal Kenya at the time
Petrocity petrol station rooftop solar installation
Grid-Tie 10–100 kW per site Multiple Sites, Kenya

Petrocity Petrol Stations Solar Programme

ClientCommercial Fuel Retail Chain
Sites6 stations installed
TypeMulti-Site Grid-Tie
Impact 6 fuel stations · 10–100 kW each · multi-site rollout coordination.

Challenge: Fuel stations operating long hours depended heavily on grid electricity for lighting, pumps, refrigeration, and security systems across multiple locations.

Solution: Led installation and maintenance of six grid-tie PV systems across Petrocity stations, reducing electricity costs and improving energy resilience.

Outcome: Reduced grid dependency across multiple stations and improved operational sustainability of fuel retail infrastructure Kenya-wide.

Performance metrics
  • 6 sites installed
  • Systems ranging between 10 kW and 100 kW
  • Multi-site rollout coordination experience
Industrial bakery rooftop solar installation for Bakeries (Mombasa) Ltd
Grid-Tie 40–100 kW per site Mombasa Industrial

Bakeries (Mombasa) Ltd Industrial Solar

ClientIndustrial Manufacturing (Supa Loaf)
Installations10 systems completed
TypeIndustrial Grid-Tie
Impact 10 industrial sites · 40–100 kW each · improved daytime production contribution.

Challenge: Industrial baking operations require continuous daytime energy supply with high loads across multiple production facilities.

Solution: Installed and maintained 10 grid-tie PV systems across Supa Loaf facilities to offset production electricity costs at scale.

Outcome: Improved daytime solar energy contribution to industrial production and reduced electricity expenditure across the manufacturing network.

Performance metrics
  • 10 installations completed
  • 40 kW to 100 kW system range
  • Industrial solar deployment experience
Fisheries Mombasa rooftop 50 kW grid-tie solar PV installation
Grid-Tie 50 kW Mombasa

Fisheries Mombasa Solar PV System

ClientGovernment / Fisheries Processing
TypeRooftop Grid-Tie
StatusCommissioned
Impact 50 kW · Reduced reliance on utility electricity for government processing.

Challenge: Government fisheries facility had high daytime electricity consumption affecting operational cost efficiency.

Solution: Installed and supported commissioning of a 50kW rooftop grid-tie solar PV system to offset daytime electricity consumption.

Outcome: Reduced dependence on utility electricity and improved long-term operational cost efficiency at the government processing facility.

Performance metrics
  • 50 kW installed
  • Commercial institutional solar deployment
  • Government infrastructure experience
Multi-platform inverter commissioning across Huawei, Deye, Victron and Growatt
Grid-Tie 5–30 kW per site Multiple Sites, Kenya

Multi-Site Commercial Commissioning

ClientResidential & SME Commercial
InvertersHuawei, Deye, Victron, Growatt
TypeMulti-Platform Commissioning
Impact Multi-platform inverter commissioning · technical standards compliance.

Challenge: Clients required proper commissioning and inverter configuration to ensure optimal system performance after installation across multiple platforms.

Solution: Commissioned multiple solar PV systems using Huawei grid-tie, Deye hybrid (single & three-phase), Victron off-grid, and Growatt hybrid inverters.

Outcome: Improved system performance reliability and ensured technical compliance across residential and SME deployments.

Performance metrics
  • Multiple commissioning assignments completed
  • Multi-platform inverter expertise
  • Residential + SME deployment experience
Conservancy solar off-grid systems with three mini-grids in Laikipia, 127 kWp combined with 440 kWh BESS
Off-Grid 127 kWp + 440kWh BESS Laikipia County

Conservancy Solar Off Grid Systems

ClientConservation Infrastructure
Systems3 off-grid mini-grids (39.83 + 64.74 + 23.24 kWp)
BESS120kWh + 260kWh + 60kWh per site
Impact 127 kWp combined · 440 kWh+ BESS across 3 conservation sites.

Challenge: Remote conservation monitoring and research operations required reliable off-grid energy with large battery storage for continuous uptime.

Solution: Designed and supported installation of three off-grid solar mini-grids with 440kWh+ combined BESS, plus weather station configuration and scheduled/unscheduled O&M support.

Outcome: Delivered reliable renewable power infrastructure supporting conservation monitoring and research continuity in remote Laikipia locations.

Performance metrics
  • 3 off-grid energy sites
  • Over 127 kWp combined solar capacity
  • 440 kWh+ battery storage deployed
Sanana Hotel rooftop hybrid solar installation in Mombasa
Hybrid 24 kW + 20kWh BESS Mombasa

Sanana Hotel Hybrid Solar PV System

ClientHospitality
BeforeKSh 200,000 / month
AfterKSh 45,000 / month (77% saving)
Impact ▼ 77% electricity cost reduction · KSh 200,000 → KSh 45,000 / month.

Challenge: Hotel facing high electricity bills from heavy daytime cooling loads and night backup requirements, with significant grid dependency and operating cost pressure.

Solution: Installed a 24kW hybrid solar PV system with 20kWh battery storage integrating battery backup to offset grid consumption and improve reliability.

Outcome: Monthly electricity costs reduced from KSh 200,000 to KSh 45,000, a verified 77% reduction, making this one of Kinawa's strongest hospitality ROI case studies.

Performance metrics
  • 24 kW PV installed
  • 20 kWh battery storage
  • 77% electricity cost reduction achieved
Residential and Airbnb hybrid solar rooftop installation
Hybrid 5–30 kW Watamu / Diani

Residential & Airbnb Hybrid Solar Programme

ClientResidential & Hospitality
Systems10 hybrid systems deployed
TypeGrid + Battery Backup
Impact 10 hybrid systems · 5–30 kW · coastal hospitality + residential.

Challenge: Coastal hospitality facilities required reliable power with reduced generator dependence and lower electricity costs.

Solution: Installed and maintained multiple hybrid solar PV systems at Watamu House, Airbnb Diani, and additional residential coastal sites.

Outcome: Improved reliability of electricity supply and reduced operating energy costs for 10 hospitality and residential properties.

Performance metrics
  • 10 hybrid systems deployed
  • Hospitality energy optimization experience
  • Watamu, Diani and additional residential coastal sites
Mobile digital schools container hybrid solar system
Hybrid 5–10 kW Multiple Sites

Mobile Digital Schools Container Hybrid Systems

ClientEducation Infrastructure
StorageGel & Lithium Battery
TypePortable Hybrid
Impact Portable hybrid · Gel + Lithium storage · enabled remote digital learning.

Challenge: Mobile digital learning environments required portable, reliable electricity supply for containerized classrooms in remote regions.

Solution: Installed hybrid solar systems with gel and lithium battery storage supporting containerized digital classroom operations.

Outcome: Enabled off-grid digital learning environments in remote Kenya, improving access to education technology.

Performance metrics
  • Portable education infrastructure electrification
  • Hybrid storage deployment experience
  • 5 kW to 10 kW per containerized classroom
Ranch security mast off-grid solar with Victron MultiPlus-II GX inverter and BlueSolar charge controller installation
Off-Grid 13 Mast Sites + HQ Conservation Ranch

Ranch Security Mast Solarization Programme

ClientConservation Security Infrastructure
Systems13 monitoring stations + HQ
SupportInstallation, Commissioning, O&M
Impact 13 mast sites + HQ · continuous wildlife security monitoring.

Challenge: Wildlife security monitoring required reliable decentralized energy in remote areas without grid connectivity across the conservation ranch estate.

Solution: Installed off-grid solar systems powering 13 security mast monitoring stations and headquarters, including full commissioning and ongoing O&M support.

Outcome: Enabled continuous wildlife security monitoring across a distributed conservation network, demonstrating long-distance remote deployment reliability.

Performance metrics
  • 13 mast monitoring systems powered
  • Remote infrastructure deployment
  • Long-distance system reliability design
National reserve ranger station off-grid solar electrification
Off-Grid 7 Ranger Stations National Reserve

National Reserve Stations Solar Electrification

ClientConservation Operations
Stations7 ranger facilities electrified
TypeStandalone Off-Grid PV
Impact 7 ranger stations · improved operational effectiveness and safety.

Challenge: Remote ranger stations needed reliable off-grid electricity to support field operations and security activities across national reserve coverage.

Solution: Installed standalone solar PV systems at ranger facilities across multiple remote conservation locations, coordinating logistics for distributed deployment.

Outcome: Improved operational effectiveness and safety of conservation personnel through reliable electricity access at all stations.

Performance metrics
  • 7 ranger stations electrified
  • Remote deployment logistics coordination
  • Conservation operations field support
Girls Secondary School 10 kW off-grid solar electrification, Northern Kenya
Off-Grid 10 kW Northern Kenya

Girls Secondary School Solar Electrification

ClientEducational Institution
CountyWajir (Northern Kenya)
ImpactExtended study hours enabled
Impact 10 kW · extended study hours and improved educational conditions.

Challenge: The school lacked reliable electricity for lighting and academic activities, limiting student study hours in a remote and underserved county.

Solution: Designed and implemented a 10kW off-grid solar PV system supporting school electrification across lighting and essential classroom loads.

Outcome: Improved electricity access for students, enabling extended study hours and better educational conditions in Wajir County.

Performance metrics
  • 10 kW off-grid installation
  • Institutional solar electrification experience
  • Northern Kenya education impact
School electrification programme students benefitting from solar lighting at a rural school site
Off-Grid 3.6–5 kW per site Kwale / Kilifi / Kajiado

School Electrification Programme

ClientEducational Institutions (NGO)
SitesMbegani, Bamba, Lositeti
Schools3 electrified
Impact 3 rural schools electrified across Kwale, Kilifi and Kajiado counties.

Challenge: Rural schools in Kwale, Kilifi, and Kajiado lacked reliable electricity for learning activities and digital access.

Solution: Installed standalone solar PV systems (3.6–5kW per site) supporting lighting and essential school loads across three rural school sites.

Outcome: Improved learning environments and extended study hours in underserved communities across three counties.

Performance metrics
  • 3 schools electrified
  • Rural deployment logistics
  • Education sector electrification experience
Kajiado private residence powered by off-grid solar system
Off-Grid 5 kW + 10kWh BESS Kajiado

Kajiado Private Residence Off-Grid System

ClientResidential
Storage10kWh battery storage
TypeAutonomous Off-Grid PV
Impact 5 kW PV + 10 kWh BESS · standalone residential energy independence.

Challenge: The home required reliable electricity in an area with unreliable grid access, demanding a fully autonomous energy solution.

Solution: Designed and installed an autonomous off-grid solar PV system with 5kW panels and 10kWh battery storage.

Outcome: Delivered energy independence and reliable household electricity supply, demonstrating standalone residential off-grid deployment experience.

Performance metrics
  • 5 kW PV installed
  • 10 kWh battery storage
  • Standalone residential system deployment
PAYGo rural electrification 100-500 Wp household solar across Kwale, Kilifi and Mombasa
Off-Grid 100–500 Wp Kwale / Kilifi / Mombasa

PAYGo Rural Electrification Programme

ClientRural Households
ModelPay-As-You-Go Solar
ReachMulti-county last-mile
Impact Multi-county rollout · 100–500 Wp PAYGo household systems.

Challenge: Low-income rural households in coastal Kenya lacked access to affordable electricity, limiting productivity and quality of life.

Solution: Supported rollout of small-scale PAYGo solar home systems and solar water pumping across Kwale, Kilifi, and Mombasa rural zones.

Outcome: Enabled decentralized energy access and improved household productivity, demonstrating last-mile distributed energy delivery experience.

Performance metrics
  • Multi-county rollout
  • PAYGo deployment experience
  • Last-mile electrification exposure
Ngara apartment borehole solarization with cleaned-up rooftop solar installation for borehole and common-area loads
Water Pumping 3 kW + 5 kW Ngara, Nairobi

Ngara Apartment Borehole Solarization

ClientResidential Apartments
Systems3kW borehole + 5kW common area lighting
TypeUrban Borehole Solarization
Impact 3 kW pump + 5 kW lighting · urban dual-system borehole solarization.

Challenge: High electricity costs for borehole pumping and shared facility lighting were increasing operational costs for the residential block.

Solution: Installed dual solar systems across the apartment facility: 3kW borehole pumping and 5kW common area lighting.

Outcome: Reduced electricity expenses and improved utility sustainability, demonstrating urban residential borehole solarization capability.

Performance metrics
  • Dual-system installation
  • Urban borehole solarization deployment
  • Reduced electricity expenses for shared utilities
Airstrip borehole solar pumping control installation in Oloitoktok
Water Pumping 15 kW Oloitokitok

Airstrip Borehole Solarization

ClientAviation Support Infrastructure
TypeSolar Borehole Pumping
PriorityCritical Remote Infrastructure
Impact 15 kW · critical aviation support water infrastructure.

Challenge: Remote airstrip water infrastructure required reliable pumping without grid reliance, serving critical aviation support operations.

Solution: Installed a 15kW solar borehole pumping system supporting airstrip operations in a remote location.

Outcome: Reliable remote aviation support water infrastructure delivered with zero grid dependency, demonstrating critical infrastructure solar deployment.

Performance metrics
  • 15 kW solar pumping deployment
  • Critical infrastructure support project
  • Remote aviation water system electrified
River Tana floating solar pumping system for agricultural irrigation
Water Pumping Floating Solar River Tana, Garissa

River Tana Floating Solar Pumping System

ClientAgricultural Irrigation
TypeFloating Solar Pumping
ApplicationFarm Irrigation Infrastructure
Impact Floating solar · agricultural irrigation pumping.

Challenge: Farm irrigation along River Tana required reliable pumping infrastructure with floating solar mounting in variable river conditions.

Solution: Installed floating solar pumping infrastructure supporting agricultural irrigation, a specialist deployment requiring adaptive mounting engineering.

Outcome: Improved agricultural productivity through renewable-powered irrigation along River Tana, demonstrating floating solar specialist capability.

Performance metrics
  • Floating solar deployment experience
  • Agricultural irrigation infrastructure support
  • River-based pumping engineering
Kiwanja community borehole solarization with World Vision
Water Pumping 7.5 kW Kiwanja

Kiwanja Borehole Solarization with World Vision

ClientNGO Water Infrastructure
PartnerWorld Vision Kenya
TypeCommunity Water Access
Impact 7.5 kW community borehole · improved water availability.

Challenge: Community borehole required sustainable off-grid energy supply to deliver reliable water access for rural communities without grid connectivity.

Solution: Installed 7.5kW solar-powered borehole pumping system in partnership with World Vision Kenya to support community water access.

Outcome: Improved water availability reliability for local communities, demonstrating NGO rural water infrastructure delivery capability.

Performance metrics
  • 7.5 kW community borehole solarization
  • NGO rural water infrastructure delivery experience
  • Off-grid community water access
National bakery energy electrical audit 44 sites EPRA compliance Kenya
Energy & Electrical Audit 44 Facilities Nationwide, Kenya

National Bakery Network Multi-Site Energy & Electrical Audit

ClientIndustrial Manufacturing Network
Scope44 production branches nationwide
ComplianceEPRA Energy Management Regulations & Energy Act 2019
Impact 44 facilities audited · EPRA-compliant nationwide programme.

Challenge: Nationwide bakery network required EPRA-compliant energy and electrical audits across 44 facilities, covering high costs, aging infrastructure, power quality, and compliance gaps.

Solution: Implemented structured multi-site Energy and Electrical Audit Programme covering consumption analysis, load profiling, switchgear inspections, earthing assessments, thermographic testing, and EPRA-aligned reporting preparation across all 44 sites.

Outcome: Delivered national energy and electrical performance framework, achieved EPRA compliance readiness, and produced investment-grade efficiency upgrade roadmap covering all facilities.

Performance metrics
  • 44 sites audited
  • Nationwide rollout
  • Regulatory compliance audit delivery experience
Kenya Pipeline Company solarization feasibility across 8 pipeline station infrastructure sites
Feasibility Study 8 Pipeline Stations National Infrastructure

Kenya Pipeline Company Solarization Feasibility

ClientNational Energy Infrastructure Operator
Sites8 pipeline stations assessed
TypeTechnical & Financial Feasibility
Impact 8 pipeline stations · strategic renewable energy decision-support framework.

Challenge: National pipeline operator needed assessment of technical and financial viability of solar integration across strategic pipeline infrastructure.

Solution: Conducted solarization feasibility assessment covering technical sizing, site suitability, economic viability, and implementation recommendations across 8 stations.

Outcome: Delivered decision-support framework enabling strategic renewable energy integration planning at national infrastructure scale.

Performance metrics
  • 8 national infrastructure sites assessed
  • Strategic energy transition consulting experience
  • Technical + financial feasibility framework delivered
NGO Samburu office solar PV rooftop array after BESS upgrade and troubleshooting
O&M / BESS 3 Systems Restored Samburu

NGO Samburu: BESS Upgrade & Troubleshooting

ClientNGO Humanitarian Infrastructure
WorkDiagnostics, battery replacement, optimization
Scope3 NGO office installations
Impact 3 NGO systems restored · BESS performance recovered across Samburu offices.

Challenge: Existing solar BESS systems at NGO Samburu offices experienced performance challenges reducing reliability for humanitarian operations.

Solution: Performed system diagnostics, battery replacement, configuration troubleshooting, and performance optimization across three office installations.

Outcome: Restored full system reliability and improved operational energy availability across multiple humanitarian field sites in Samburu.

Performance metrics
  • 3 systems restored
  • Battery replacement completed
  • Remote technical troubleshooting delivery
Garissa mosque solar backup system supporting community operations
Off-Grid Backup 5 kW Garissa

Garissa Mosque Solar Backup System

ClientReligious Institution / Community
TypeSolar Backup Power
ImpactContinuous community operations
Impact 5 kW backup · continuous community operations through grid outages.

Challenge: Frequent grid outages disrupted lighting and facility operations at the mosque, affecting continuity of community activities.

Solution: Installed a 5kW solar backup system providing uninterrupted power supply during grid outages.

Outcome: Improved electricity reliability and ensured continuity of community religious and social activities, demonstrating community infrastructure electrification.

Performance metrics
  • 5 kW installed
  • Community infrastructure support deployment
  • Religious institution backup solar experience
International humanitarian organization Nairobi office with 7 AC units installed as part of an energy infrastructure upgrade
Support Infrastructure 7 AC Units Nairobi

International Humanitarian Organization Nairobi: Energy Infrastructure Upgrade

ClientInternational humanitarian organization
CategoryHybrid Support Infrastructure
ScopeInstallation of 7 AC units
Impact 7 AC units integrated · improved thermal comfort and electrical load optimization.

Problem: Office infrastructure required improved thermal comfort and electrical load optimization.

Solution: Installed 7 air-conditioning systems integrated within the existing energy infrastructure support environment.

Impact: Improved operational comfort and productivity of office facilities.

Performance metrics
  • International NGO infrastructure support experience
  • 7 AC units integrated within office energy environment
  • Improved thermal comfort and electrical load profile
Scope of Work

What we deliver, sector by sector.

Kinawa's portfolio spans all major solar system types and advisory disciplines across commercial, conservation, institutional, and community projects.

01

Grid-Tie Systems

Commercial rooftop, industrial, and retail installations designed to offset grid electricity costs and reduce energy expenditure across C&I clients.

02

Hybrid Systems

Solar + battery storage combinations delivering reliability and grid independence for hotels, residences, conservation, and institutional facilities.

03

Off-Grid Systems

Standalone solar PV for schools, conservation stations, remote communities, and rural electrification across Kenya and East Africa.

04

Solar Water Pumping

Borehole solarization, floating solar, and irrigation pumping for residential, commercial, agricultural, and NGO water infrastructure.

05

Energy & Electrical Audits

Multi-site EPRA-compliant energy audits covering consumption analysis, electrical safety, load profiling, and efficiency improvement roadmaps.

06

Feasibility Studies

Technical and financial feasibility assessments for national infrastructure operators, developers, and institutional energy transition planning.